News Detail



Planned New Building for the Centre of Excellence for Conveyor Modules and Subsystems

Our facilities, which up to now have been housed in four different buildings, will be accommodated under one roof from the summer of 2010. The Centre of Excellence for Conveyor Modules and Subsystems, part of  Sinsheim-based Interroll Automation, signed a preliminary contract on 16 October 2008 with Sinsheim Council, which provides for the construction of a new building to house production and offices on the neighbouring Sinsheim South industrial estate close to the "Rhein-Neckar Arena" and adjacent to the A6 motorway.

Providing for further growth, the four different assembly halls, in which products, such as the Interroll Crossbelt Sorter, Intelliveyor, belt conveyor and roller conveyor, are developed and manufactured for system integrators and their customers throughout the globe, will then be combined in a single 12,000 m² production area, which will be enhanced by a two-storey 3,200 m² office suite. The total floor area of the building will be approximately 42,700 m² and it will have a volume of 105,000 m³. Construction is planned to start in July 2009.
Current main building of Interroll Automation GmbH in Sinsheim.



© Interroll | Disclaimer